Short answer
Octopus’s export rates follow what electricity is worth on the wholesale market. Flat Outgoing Octopus is a variable tariff Octopus can change with notice, and Agile Outgoing moves every half hour with day-ahead wholesale prices. With so much solar on the grid around midday, power exported then is worth less, and the export rules set no minimum beyond staying above zero. Our Outgoing pages chart how the rates have actually moved.
Where to see what changed
We record the rates Octopus publishes for each region. Our Outgoing Octopus page charts the flat rate month by month, so you can see when it moved, and the Agile Outgoing page charts how its half-hourly prices have moved over the same months. Those charts come from Octopus’s published rates. The reasons below come from Octopus and Ofgem, not from the charts.
Export is paid from wholesale value
When you buy electricity, the price includes network costs, government levies and taxes. When you export, you sell only the energy itself, so the export rate follows what that energy is worth on the wholesale market. Octopus also has no standing charge on export, so it covers its own costs from the export rate.
Ofgem’s wholesale market charts show how much those prices can move, and how volatile day-ahead prices in particular can be. When wholesale electricity is worth less, so is the power you export.
Midday solar is worth less
Octopus points to timing. Most home solar is made around the middle of the day, when the grid already has plenty of solar from everyone else and demand is lower. Wholesale prices at those times are lower, and that pulls down the average a flat export rate can afford to pay.
How each Outgoing tariff can change
Each version of Outgoing changes in its own way:
- Outgoing Octopus is a variable tariff with a flat rate. Octopus says rates can change, but it will give you plenty of notice before they do.
- Agile Outgoing follows uncapped day-ahead wholesale prices half hour by half hour, so its rates move every day. It is a 12-month fixed-term tariff with a locked-in formula and no exit fees.
- Prime Outgoing pays a higher rate from 4pm to 7pm and a lower rate the rest of the day, also on a 12-month term with a locked-in formula and no exit fees.
- Octopus’s export terms say it gives 30 days’ notice before changing an agile export formula.
What the rules guarantee
The Smart Export Guarantee requires some suppliers to pay small-scale generators for the power they export, but Ofgem leaves each supplier to set its own rate and terms. The one hard rule is that a SEG rate must always be above zero. There is no regulated minimum beyond that, so export rates across the market move with what suppliers think exported power is worth.
Octopus’s own SEG tariff pays a fixed flat rate and is meant for people who buy their electricity from another supplier. Octopus import customers are pointed to Outgoing instead.
Getting more for your export
The rate you get depends a lot on when you export:
- Use more of your own solar during the day. A unit you would otherwise buy costs more than export pays, because the import price carries network costs, levies and taxes.
- With a battery, you can hold midday solar and export it in the 4pm to 7pm peak, on Prime Outgoing, Agile Outgoing or Octopus Flux.
- Check which export tariffs pair with your import tariff before switching either side.
- Compare today’s export rates for your region before you change.
Questions people ask
Why did my Outgoing Octopus rate go down?
Outgoing Octopus is a variable tariff, so Octopus can change its rate, giving notice first. Octopus says export pays the wholesale value of the energy, and power exported around midday, when most solar is made, is worth less. Our Outgoing page charts when the flat rate changed.
Why is export worth less than the electricity I buy?
Your import price includes network costs, levies and taxes, which you do not earn back when you export. Octopus also covers its export costs from the export rate, as there is no export standing charge. And most solar is exported around midday, when wholesale prices are lower.
Is Agile Outgoing better than flat Outgoing now?
It depends on when you can export. Agile Outgoing follows day-ahead wholesale prices, so it rewards homes with a battery that can export at the evening peak. Without a battery, most of your export lands at midday, when Agile Outgoing prices tend to be lower. Compare the two for your region before you switch.
Can my export rate fall to zero?
Not on a Smart Export Guarantee tariff: Ofgem says SEG rates must always be above zero. Agile Outgoing follows uncapped wholesale prices half hour by half hour, so some half hours pay much less than others. Check the current rates for your region before you plan around them.
Will Octopus export rates go back up?
Nobody can say. They follow wholesale electricity prices, which Ofgem’s charts show can move a lot. We do not forecast rates. Our Outgoing pages show the published rates as they change.
Can I lock in an export rate?
Not a flat rate on Outgoing, which is variable. Agile Outgoing and Prime Outgoing are 12-month fixed-term tariffs, but what is fixed is the formula, not the price. Octopus’s SEG tariff pays a fixed flat rate, but it is meant for people who buy their electricity from another supplier.
Where can I see past Octopus export rates?
Our Outgoing and Agile Outgoing pages chart the rates Octopus has published for each region. Octopus also publishes every rate through its free API.
Tariffs in this guide
Related guides
- How big should your solar and battery system be?How to size solar panels and a home battery for your usage, the battery sizes Octopus installs, and how sizing affects which tariff pays best.
- Solar panels with Octopus Energy: getting the most from themHow to set up solar panels with Octopus: getting paid for export, choosing an import tariff, and when a battery or EV changes the answer.
- Import, export and generation meters (and MPANs) explainedThe difference between import, export and generation readings for solar homes, why export needs its own MPAN, and what each one is used for.
- Octopus flexibility schemes and home batteriesHow Octopus pays you to shift power: Saving Sessions, Postcode Power Ups and the national Demand Flexibility Service, and what Charge Pack does with a battery.
- Octopus Charge Pack: the home battery add-on explainedWhat Octopus Charge Pack does with your home battery, which tariffs and batteries it works with, how the grid sessions and credits work, and who should skip it.
- Octo Assist: how to get help with an Octopus billWhat Octopus’s Octo Assist fund offers customers struggling to pay, how to apply, and what else to do first.
Primary sources
- Why do I get paid less for exporting electricity than I pay for importing electricity? — Octopus Energy; checked 2026-11-15. Checked 15 November 2026 (HTTP 200): import prices include network costs, government levies and taxes that export payments do not; export tariffs have no standing charge, so Octopus covers its admin costs from the export unit rate; most solar is generated around the middle of the day, when the grid has plenty of solar and less demand, so wholesale prices then are lower and that pulls down the average a flat export rate can pay; a battery lets you sell later, at peak times, on tariffs such as Flux and Agile Outgoing.
- Wholesale market indicators — Ofgem; checked 2026-11-15. Checked 15 November 2026 (HTTP 200; the older /energy-data-and-research/ address redirects here): Ofgem publishes charts of Great Britain wholesale electricity and gas prices, both forward contracts and day-ahead (spot) prices; wholesale energy is the largest part of a customer’s bill, wholesale prices can vary a lot, and day-ahead markets can be very volatile.
- What is Outgoing Octopus, and how do I join? — Octopus Energy; checked 2026-11-15. Checked 15 November 2026 (HTTP 200): Outgoing comes in three forms: Outgoing Octopus, a variable tariff paying a flat rate per unit exported; Agile Outgoing Octopus, matched to day-ahead wholesale prices half hour by half hour; and Prime Outgoing Octopus, with a higher rate from 4pm to 7pm and a lower rate the rest of the day.
- Outgoing Octopus — Octopus Energy; checked 2026-11-15. Checked 15 November 2026 (HTTP 200; octopus.energy/outgoing/ redirects here): to join Outgoing, including Prime Outgoing, you need to be an Octopus Energy customer, have a smart meter Octopus can receive half-hourly export data from, and be on an import tariff that pairs with Outgoing; Prime Outgoing is described as best for solar and home battery owners who can shift export to the 4pm to 7pm prime window, with no requirement to have bought the equipment from Octopus. Checked 14 November 2026: Prime Outgoing pays a higher rate for export from 4pm to 7pm and a lower rate the rest of the day, is a 12-month fixed-term tariff with a locked-in rate formula and no exit fees, and is described as best for solar and home battery owners who can shift export into the evening; the page redirects to octopus.energy/smart/outgoing/. Agile Outgoing, Outgoing Octopus (variable flat rate) and Prime Outgoing; you must be an Octopus customer and only certain import tariffs pair with Outgoing; a smart meter sending half-hourly export data; a new export MPAN from the DNO, taking one to four weeks, for first-time export. Agile Outgoing follows uncapped day-ahead wholesale prices half hour by half hour, is a 12-month fixed-term tariff with a locked-in rate formula and has no exit fees; Outgoing Octopus is variable, with notice before rates change; nearly all SMETS2 and most SMETS1 meters can send half-hourly export data; anyone who started FIT payments in the last 12 months cannot switch to Outgoing yet; application about two days, export MPAN one to four weeks, enrolment about five days.
- Export tariffs terms and conditions — Octopus Energy; checked 2026-11-14. Export contract, metering, MPAN, half-hourly data and generation eligibility requirements. V2.2, updated 1 November 2024: every export tariff needs half-hourly smart meter readings and a dedicated export MPAN; solar, wind and micro-CHP must be certified through MCS, Flexi-Orb or an equivalent scheme, or the customer supplies the information Octopus asks for; some export tariffs are only available with an Octopus import tariff; Octopus need not pay for "Brown Export" such as power from batteries or standby generators; generation must be in Great Britain and no more than 5MW (50kW for micro-CHP); no FIT export payments at the same time. Payment: with Octopus import, the monthly bill shows import and export together, you pay the net difference, any surplus shows as account credit, and a cash refund can be requested if readings are up to date; export-only customers send export readings every month; VAT does not apply; an exit fee may apply in the first 12 months; Octopus gives 30 days’ notice of a change to an agile export formula.
- Smart Export Guarantee (SEG) — Ofgem; checked 2026-11-14. The SEG launched on 1 January 2020 and requires some electricity suppliers (SEG Licensees) to pay small-scale generators for exported low-carbon electricity; suppliers set their own rate and terms, but SEG tariff rates must always be above zero; payments use export meter readings; eligible technologies are solar PV, wind, hydro and anaerobic digestion up to 5MW, and micro-CHP up to 50kW, in Great Britain.
- Smart Export Guarantee (SEG) at Octopus — Octopus Energy; checked 2026-11-14. Octopus SEG is a fixed flat export rate for people who keep their import supply with another supplier; renewable generation in Great Britain up to 5MW (50kW micro-CHP); a meter that sends half-hourly export readings, usually a smart meter; MCS, Flexi-Orb or equivalent certification; a DNO letter approving the export MPAN; no SEG while receiving FIT export payments; an exit fee if you move your SEG to another supplier in the first 12 months; Octopus import customers are pointed to Outgoing Octopus instead.