OctoTariffs

Solar and batteries

Solar panels with Octopus Energy: getting the most from them

How to set up solar panels with Octopus: getting paid for export, choosing an import tariff, and when a battery or EV changes the answer.

Edited by Rob Gibbs. Published: . Guidance reviewed: .

Methodology · Corrections

Short answer

Register your panels for export, then choose an export tariff and an import tariff that pair well. Without a battery, flat Outgoing Octopus plus a standard import tariff is simple and usually sound. With a battery or an EV, the cheap-overnight import tariffs and the time-varying export tariffs become worth comparing.

Step one: export registration

Ask Octopus to set up an export MPAN and send your installation evidence. Until that is in place, electricity you export is not paid for.

Use it or sell it?

Each kWh you use yourself saves the full import price; each kWh you export earns only the export rate, which is usually lower. Running the washing machine, dishwasher or hot water in the middle of the day is usually worth more than exporting.

Choosing tariffs by setup

A rough starting point:

  • Panels only: Flexible or Fixed import with Outgoing Octopus export.
  • Panels and a battery: Flux, Intelligent Flux, or a cheap-overnight import tariff with Outgoing export.
  • Panels and an EV: Intelligent Go for import, then check which export tariffs pair with it.

Questions people ask

Do I need a battery to benefit from solar with Octopus?

No. You save on everything you use directly and get paid for export. A battery raises how much generation you use or sell at peak prices.

How long do solar panels take to pay back?

It depends on system cost, generation, how much you use yourself and your rates. The payback calculator uses today’s regional rates.

Tariffs in this guide

Primary sources

  • Solar and battery support — Octopus Energy; checked 2026-08-27. Supplier guidance on solar self-consumption, battery use and import/export tariff pairing.
  • Export tariffs terms and conditions — Octopus Energy; checked 2026-08-27. Export contract, metering, MPAN, half-hourly data and generation eligibility requirements.